Formwork Construction system in Kuwait
Anwar Abdullah Jdaie Alghanim
Construction Training Institute || The Public Authority for Applied Education & Training (PAAET) || Kuwait.
Tab title
This study aimed to evaluate the differences between steel and timber formwork regarding cost, quality, and time of completion of building construction projects in Kuwait. Forty projects were selected to represent the construction business in the country. The study method was based on survey data collection (questionnaires, interview, and observation). The findings of the study showed that the contractors prefer to buy steel formwork than timber formwork system, although timber formwork is cheaper than steel formwork. Also the study found that the field of steel formwork reached a mean of (4.425), which puts steel formwork in first rank. Keywords: Construction system; steel formwork; timber formwork; Kuwait; SPSS.
نظام صب الخرسانة في الكويت
Tab title
هدفت هذه الدراسة إلى تقييم الاختلافات بين القوالب المصنوعة من الصلب والخشب فيما يتعلق بالتكلفة والجودة ووقت الانتهاء من مشاريع بناء المباني في الكويت، تم اختيار أربعين مشروعًا لتمثيل مشاريع البناء في البلاد. اعتمدت هذه الدراسة على جمع بيانات المسح من خلال الاستبيانات والمقابلة والملاحظة. أظهرت نتائج الدراسة أن المقاولين يفضلون شراء القوالب الفولاذية على نظام قوالب الخشب، بالرغم من أن القوالب الخشبية أرخص منها. كما توصلت الدراسة إلى أن مجال القوالب الفولاذية وصل إلى متوسط (4.425)، وهو ما يضعه في المرتبة الأولى. الكلمات المفتاحية: نظام صب الخرسانة، القوالب الخشبية، القوالب الفولاذية، الكويت، SPSS.